MANAJAMEN KONSTRUKSI PADA GEDUNG KANTOR JALUR NUGRAHA EKAKURIR EMPAT LANTAI DI KOTA PONTIANAK
MANAJAMEN KONSTRUKSI PADA GEDUNG KANTOR JALUR NUGRAHA EKAKURIR EMPAT LANTAI DI KOTA PONTIANAK
Abstrak
The author carried out Construction Management On The Four Story Jalur Nugraha Ekakurir Office On Abdul Rahman Saleh Street, Pontianak City,, which had previously been carried out structural planning and plan.
Therefore, to realize the construction of the Jalur Nugraha Office Building, proper construction management planning is needed, so that the construction process of this office runs smoothly, on time, efficiently and the desired quality can be achieved. Therefore, the author plans a construction management system for the construction of the Jalur Nugraha Ekakurir Building which is used as the title of this research. The method used in this construction management discussion is the management system of cost, quality, time, Human Resources (HR) and Occupational Health and Safety (OHS) on structural work which includes foundations, beams, columns and floor plates. Based on the results of the analysis of the method above, the cost of preparatory work and the structure required in the completion of the Jalur Nugraha Ekakurir Building construction project is Rp. 18,500,000,000 and can be completed within 25 weeks or 222 calendar days. For quality planning, the results are form of quality control and a list of specification tables. In Human Resources (HR) planning is number of labor needs as a means for good work implementation and in the planning of OHS management planning is form of identification and control of potential OHS hazards to each type of work and the cost for the needs of Personal Protective Equipment (PPE) and Work Protective Equipment (WPE) amounted to Rp. 38,820,000.
Keywords: planning, construction management, office, structural work, cost
Referensi
[2] Soemalrdi, dkk. (2007). Pengembalngaln Sistem Ealrned Vallue untuk Pengelolalaln Proyek Konstruksi. Lalporaln Halsil Riset. Institut Teknologi Balndung.
[3] Mukomoko, J.Al. (1987). Dalsalr Penyusunaln Alnggalraln Bialyal Balngunaln. Galyal Medial Praltalmal. Jalkalrtal.
[4] Surbalkti, Al. Al. (2013). Pengalruh Malnaljemen Mutu Paldal Talhalp Pelalksalnalaln Konstruksi. Gralmedial. Balndung.
[5] Sealrs, R. H., & Clough, G. Al. (1991). Determining Construction Malnalgement Educaltion Quallificaltions alnd the Effects of Construction Malnalgement Educaltion Deficiencies on Turkish Construction. Vol. 7 No. 2.
[6] Balchtialr, I. (2001). Rencalnal daln Estimalte Reall Of Cost. Bumi Alksalral. Jalkalrtal.
[7] Nurjalnalh. (2017). Alnallisis Malnaljemen Konstruksi Pembalngunaln Rumalh Salkit Ibu daln Alnalk Sumber Kalsih Kotal Cirebon. Vol 6. No 5. Falkultals Teknik Universitals Swaldalyal Gunung Jalti.
[8] Siswalnto. (2007). Perencalnalaln daln Pengendallialn Proyek. Sinalr Gralfikal. Jalkalrtal.
[9] Malrwalnsyalh. (2014). Malnaljemen Sumber Dalyal Malnusial. Edisi Kedual. Allfalbetal. Balndung.
[10] Rivali, V. (2008). Malnaljemen Sumber Dalyal Malnusial Untuk Perusalhalaln. Gralfindo Persaldal. Jalkalrtal.
##submission.copyrightStatement##
##submission.license.cc.by4.footer##