Perencanaan Manajemen Konstruksi Pada Pembangunan Gedung Kantor Pelayanan Pajak Jalan Arteri Supadio Kabupaten Kubu Raya

  • Ijlal Djamirul Akmal Politeknik Negeri Pontianak
  • Reza Riansyah
  • satriyo Utomo
  • Rahayu widhiyastuti
Keywords: Perencanaan manajemen kontruksi, analisa, mutu, biaya

Abstract

One of the reasons for the construction of the Kubu Raya Regency Tax Service Office building is because currently
it still does not have a tax service office, the increasing population, the payment of taxes in Kubu Raya really
needs a tax service building, which currently has not been made by the local government. Therefore, structural
planning and plan drawings are carried out. The planning for the building of the Tax Service Office Building is
planned for Jalan Arteri Supadio, Kubu Raya Regency. Therefore, to realize the building of the Tax Service Office
Building, proper construction management is needed, so that this building can be realized. In the construction of
the Tax Service Office Building, construction management is planned with methods in the form of a cost
management system, time management, human resource management (HR), quality management, and safety,
health, work (K3) management. Based on the results of the analysis above, the total cost of structural work
obtained a value of Rp. 13,378,930,910.29. The time required for the completion of the structural work is 180
calendar days. For quality planning in the form of quality control and specification tables. For human resource
management in the form of a project organizational structure. And control of potential OHS hazards for each job
such as Personal Protective Equipment (PPE). The highest number of PPE are safety helmets, safety shoes, safety
gloves, masks and marker vests. each with a total of 278.

References

[1] Keputusan Dirjen Pajak Nomor KEP-
134/PJ/2015 tentang perubahan atas keputusan
Dirjen Pajak Nomor KEP-31/PJ/2015 tentang
penerapan organisasi, tata kerja dan saat mulai
beroperasinya instansi vertikal Dirjen Pajak
sebagai tindak lanjut peraturan menteri
keuangan nomor 206.2/PMK.01/2014
[2] Soemardi (2006). Manajemen Biaya
[3] Clough, G.A, Richard H. dan Sears. (1991).
Construction Project Management. Edisi 5.
Canada: John Willey & Sons Inc.
[4] Marwansyah (2014). Manajemen Proyek,
Graha Ilmu: Yogyakarta
[5] Manabung (2018). Manajemen Mutu
[6] Dinas PUPR Kabupaten Kubu Raya (2022),
Basic Price
[7] Kementrian PUPR RI (2022), Analisa Harga
Satuan Pekerjaan (AHSP) Kabupaten Kubu
Raya
[8] Tomy Febrianto dan Uray Yulzanajmi (2021).
Perencanaan Struktur Gedung Kantor
Pelayanan Pajak KPPJalan Arteri Supadio
Kabupaten Kubu Raya
Published
2023-12-29
How to Cite
Djamirul Akmal, I., Riansyah, R., Utomo, satriyo, & widhiyastuti, R. (2023). Perencanaan Manajemen Konstruksi Pada Pembangunan Gedung Kantor Pelayanan Pajak Jalan Arteri Supadio Kabupaten Kubu Raya. RETENSI, 4(1), 61-66. https://doi.org/https://doi.org/10.31573/retensi.v4i1.798