CONSTRUCTION MANAGEMENT PLAN OF 4-FLOOR JOINT OFFICE BUILDING IN SEPAKAT II STREET, PONTIANAK CITY

  • muhammad d zuhri mahasiswa
  • Roy Juliawan Politeknik Negeri Pontianak
  • satriyo Utomo
  • Indah Anjar Resky Politeknik Negeri Pontianak
Keywords: Management, Construction, Cost, Time, Human Resources, Quality, Occupational health safety

Abstract

This Final Project is a construction management planning that includes 5 aspects, namely starting from Cost Management, Time, Human Resources, Quality, and K3. This Final Project aims to enable the author to explore and understand more about the aspects of construction management planning. Construction management itself is a science that studies and practices the managerial and technological aspects of the construction industry. Construction management can also be interpreted as a business model carried out by construction consultants in providing advice and assistance in a development project. The planning method for construction management starts from collecting data on specifications, analyzing the unit price of work, and also based on the Regulation of the Minister of PUPR in 2022 to the instructions for implementing K3 in construction. Then the results of management planning can be concluded that the required cost budget, the duration of time used during construction, the number of workers involved in the construction project, the quality that ensures the quality of construction, and the prevention of potential hazards as a priority for Occupational Safety and Health.

References

[1] A.F. Stoner, Manajemen Sumber Daya Manusia, Jakarta: Bumi Aksara, 2006.
[2] Arief, Fathoni, Manfaat Menghitung RAB Pembangunan Rumah, Pendidikan Teknik Sipil, fatharief.wordpress.com. 2012.
[3] Clough. H. and Sears, H. A, Pengertian Dan Sistem Manajemen Waktu, Canada, John Willey & Sons Inc, 1991.
[4] Dofir. A, Pengaruh Penerapan Quality Assurance pada tahap konstruksi terhadap kinerja mutu bangunan gedung, 2002
[5] Daisma. Bali, Manajemen Sumber Daya Manusia Proyek. Proyek Manajemen, https://daismabali.com/artikel_detail/31/1/Belajar-Manajemen-Sumber-Daya-Manusia-Proyek.html, 2019
[6] Yuni. Wieke Christina, Dkk, Pengaruh Budaya K3 Terhadap Kinerja Proyek Konstruksi, Universitas Brawijaya, Malang, 2022.
[7] Laeli Nur Azizah, Pengertian Data: Fungsi, Manfaat, Jenis, dan Contohnya. Gramedia literasi, https://www.gramedia.com/literasi/pengertian-data/, 2021.
[8] Surbakti. Asri Afriliany, Pengaruh Manajemen Mutu Pada Tahap Pelaksanaan Konstruksi. Universitas Katolik Parahyangan Bandung. 2013.
[9] Juran, J.M. Merancang Mutu, Pustaka Binaman Pressindo, Jakara, 1995.
[10] TemanK3, Sistem Manajemen Keselamatan dan Kesehatan Kerja. https://temank3.com/smk3/, 2022.
Published
2024-06-28
How to Cite
zuhri, muhammad, Juliawan, R., Utomo, satriyo, & Resky, I. (2024). CONSTRUCTION MANAGEMENT PLAN OF 4-FLOOR JOINT OFFICE BUILDING IN SEPAKAT II STREET, PONTIANAK CITY. RETENSI, 4(2), 40-46. https://doi.org/https://doi.org/10.31573/retensi.v4i2.715
Section
Articles