TINJAUAN PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN GEDUNG REHABILITASI NAPZA KOTA PONTIANAK
TINJAUAN PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN GEDUNG REHABILITASI NAPZA KOTA PONTIANAK
Abstract
When carrying out a construction project activity, a construction management system is needed. Construction
Management includes management of project cost control (RAB), time (Schedule), human resources (HR),
project occupational health safety management (SMK3L) and risk classification and control. Project
implementation control must be carried out from the beginning of the work until the project work is completed
so that construction management must be by the implementation. The results of the review of construction
management planning for the construction of the NAPZA building were dominant in the implementation phase,
especially in time control where the project construction process which was originally planned for 148 days
or approximately 22 weeks became 24 weeks. This resulted in the problem of processing time where the target
was not achieved and resulted in delayed project work. Project implementation control must be carried out
from the start of work until the project is declared complete so that during the project development process
unwanted problems can be avoided. The construction management that will be applied to the NAPZA building
can make the project run well and according to the desired schedule.
References
NAPZA. Jakarta.
[2] Widodl o, 2015. l “Kesl ehatan dan k l esl ell ematan l
kerja (K3) l ”. Yogyakarta. l
[3] A, Sulaksonl o, 2006. l Peranan Sist l eml
Manajeml en Pr l oyl ek dan K l onstruksi. l Manado.l
[4] Stonl er, Jam l es A.F, 2006. l Manajeml en Sumb l erl
Daya Manusia. Jakarta: Bumi Aksara.
[5] Azwaruddin, 2008. Peng l ertian Manaj l eml enl
Konstruksi. l Pendidikan T l eknik Sipil, l
azwaruddin.blogsp l ot.c l om. Bandung. l
[6] Soel hart l o, 1995. l Manajeml en Pr l oyl ek. l Jakarta:
Erlangga. l
[7] Ramadhan, Moldy, 2017. l Peng l ertian, Fungsi, l
Tujuan dan Peranan Manaj l eml en K l onstruksi.
[8] Widiasanti dan Lengg l ogl eni, 2013. l
“Manajeml en K l onstruksi l ”.
[9] Rani, Hafnidar A., 2016. Manajeml en Pr l oyl ekl
Konstruksi. l Yogyakarta. l
[10] SKKNI, 2007. “Ahli Manajeml en K l onstruksi l
Ahli Muda”.
[11] Nawawi, Hadari, 2000. “Manajeml en Sumb l erl
Daya Manusia”. Jakarta.
This work is licensed under a Creative Commons Attribution 4.0 International License.