PELAKSANAAN PEMBANGUNAN GEDUNG SERBAGUNA PLBN ENTIKONG YANG DILAKSANA OLEH PT NINDYA KARYA (PERSERO) PADA PROYEK PENGEMBANGAN SARANA DAN PRASARANA PENUNJANG PLBN TERPADU KALIMANTAN BARAT

  • Andi Mahendra Teknik Sipil
  • Indah Rosanti
  • Indah Anjar Reski
Keywords: Keywords: Multipurpose building, contract documents, project management systematics, budget plans, and work methods.

Abstract

State Border Crossing Post of Entikong (PLBN) is one of the border points between the state owned by the
Indonesian State which is directly adjacent to the State of Malaysia, the state of Sarawak. In the PLBN
Entikong area there is a multipurpose building carried out by PT. Nindya Karya (Persero). In this final
project discusses the systematics and process of implementing the multipurpose building construction in
order to know the management system of a project, volume or backup quantity (Mutual check 100%), RAB,
weight, duration of time (Barchart), work methods, and workers' personal protective equipment. In the
process of reviewing the implementation of the Multipurpose Building construction, the methods used in
retrieving data were the methods of observation, interviews, and documentation. In addition, the data were
obtained from the project contracts documents for the development of facilities and infrastructure to support
the integrated PLBN West Kalimantan. From the review process and stages, the results are obtained,
namely: the management system of a project obtained from the project contract document, the volume that
has been crosschecked through the daily monitoring process, the cost budget plan that has been addendum
due to the addition and reduction of volume, the weight of the work after being added the duration of time
after the workday addendum, making the method of each work item carried out by direct field review, as well
as personal protective equipment used while working.

References

[1] Addiat. A. (2015). Identifikasi Penyebab
Pembengkakan Biaya (Cost Overrun) Proyek
Perumahan. (Diakses maret 2020)10 | A n d i M a h e n d r a - 2 0 2 0
[2] Ghuzdewan Arif Toriq (2017). Mata Kuliah
Metode Konstruksi Bangunan.
http://tsipil.ugm.ac.id.(Diakses maret 2020)
[3] Ghuzdewan Arif Toriq (2017). Mata Kuliah
Pengantar Manajemen Konstruksi.
http://tsipil.ugm.ac.id. (Diakses maret 2020)
[4] Husen, A. (2011). Manajemen Proyek.
Yogyakarta: Andi Offset
[5] Permen PUPR. (2018). Bangunan Gedung
Negara.http://mpk.binakonstruksi.pu.go.id.
(Diakses maret 2020)
[6] PT. Nindya Karya (persero). (2020). Profil
Sejarah Nindya Karya.
https://www.nindyakarya.co.id. (Diakses maret
2020)
[7] Santoso, B. (2003). Manajemen Konstruksi.
web.sarjanaekonomi.co.id. (Diakses maret 2020)
[8] Sibima Konstruksi. (2007). Menerapkan Sistem
Manajemen Waktu Proyek (Project Time
Management). http://sibima.pu.go.id. (Diakses
maret 2020)
[9] Sibima Konstruksi. (2007). Sistem Manajemen
Biaya Proyek (Project Cost Management).
http://sibima.pu.go.id. (Diakses maret 2020)
[10] Permen PUPR. (2018). Bangunan Gedung
Negara.http://mpk.binakonstruksi.pu.go.id.
(Diakses maret 2020)
Published
2020-12-16
How to Cite
Mahendra, A., Rosanti, I., & Reski, I. (2020). PELAKSANAAN PEMBANGUNAN GEDUNG SERBAGUNA PLBN ENTIKONG YANG DILAKSANA OLEH PT NINDYA KARYA (PERSERO) PADA PROYEK PENGEMBANGAN SARANA DAN PRASARANA PENUNJANG PLBN TERPADU KALIMANTAN BARAT. RETENSI, 1(1), 1-10. https://doi.org/https://doi.org/10.31573/retensi.v1i1.252
Section
Articles